Hello, welcome to Jiangsu Changzhou taiyada Bearing Co., Ltd
常州滚针轴承

News

Contact

Contact: Shi Lijie +86 15851987186 (same number on WeChat)

              Shi Jianlin +86 13806110378 (WeChat account)

Q Q: 657352779

Production room telephone: +86 519-86358076

General Manager Tel: +86 519-86365509

Fax: +86 519-86365069

E-mail: 657352779@qq.com

Website: en.czxmzc.com

Address: No. 98, Weijiaqiao, Niutang Industrial Park, Wujin District, Changzhou City


Precautions for installation and disassembly of water pump bearings

Your current location: Home >> News >> Industry News

Precautions for installation and disassembly of water pump bearings

Date:2018-03-19 Author:常州市泰亚达轴承有限公司 Click:

The water pump bearing should be installed under clean and dry environmental conditions. The processing quality of the mating surface of the shaft and the housing, the end surface of the shoulder, the groove and the connecting surface should be carefully checked before installation. When installing the water pump bearing, it should match the connection surface, and at the same time carefully clean and remove the burrs. The surface of the unprocessed casting must be cleaned with sand.


   When the water pump bearing is disassembled and needs to be used again, appropriate disassembly tools should be used. The water pump bearing is matched with the ferrule during the disassembly process, and the pulling force is applied to the ferrule. The disassembly force cannot be transmitted through the rolling elements, otherwise it will be easy. Crush the rolling elements and raceways.


Article url:http://en.czxmzc.com/news/408.html

Tags:汽车水泵轴承

Browse:

Share 一键分享
Welcome to leave us a message
Please enter the message here, we will contact you as soon as possible.
Name
Contacts
Phone
Phone
Email
Email
Address
Address